Independent information site. Not the official website of the airport or any government agency.

Gia Bình timeTiếng Việt
Gia Bình Airport News

InfrastructurePublished

The Gia Bình–Hà Nội road link: how long, and when it opens

A new road of about 41 km will link the airport to the Tứ Liên Bridge area. Technical opening is targeted before 31 December 2026.

Gia Bình Airport lies about 40 km east of central Hà Nội in a straight line. A new road is being built to link the airport directly with the Tứ Liên Bridge area, the gateway into central Hà Nội.

How long is it

According to Wikipedia the road is about 41 km: roughly 27.8 km in Bắc Ninh and 13.5–14 km in Hà Nội. Some sources say nearly 50 km. We will confirm the figure once it is finished.

Who builds it, and when

In December 2024 the Prime Minister put Bắc Ninh province in charge of the road. The province targets a technical opening before 31 December 2026, alongside the first international flight.

From other provinces

The airport area also connects to Ring Road 4 of the Capital Region, so travellers from neighbouring provinces can reach it without crossing central Hà Nội.

Real travel times are unknown until the road opens. When it does, we will drive it and publish the result.

Tell me when the airport opens

We tell you when flights are scheduled and the road opens. No ads.